Powerlink has been engaged to connect Vena Energy’s Wandoan South Battery Energy Storage System to the transmission network in the Surat area. The battery will have an initial capacity of 100MW and store 150MWh of energy, which could power up to 57,000 homes annually. The project involves building around 800 metres of underground cable into the Wandoan South Substation.

Status

Final project works are currently underway, with completion anticipated in mid 2021 (weather dependent).