This guide outlines the potential generation capacity which may be available at various locations across Powerlink’s transmission network. The data presented is not comprehensive. This information is preliminary only and is not intended to replace the existing processes that must be followed to seek connection to our transmission network. 


This guide was published in December 2018. A more current version of the guide was published in August 2020.