This register is maintained and made publicly available consistent with the Australian Energy Regulator's (AER’s) Ring-fencing Guideline Electricity Transmission (Version 5).
| Description of the conduct to which the waiver/interim waiver applies | Terms and conditions of the waiver/interim waver |
|---|---|
Register is current as of 24 March 2026. There are currently no items listed on the register.